首页> 外文会议>ICPNS2010 >RESEARCH AND APPLICATION OF PRE-BENT AUTOMATIC CONTROL MODELS OF 100 METERS RAIL
【24h】

RESEARCH AND APPLICATION OF PRE-BENT AUTOMATIC CONTROL MODELS OF 100 METERS RAIL

机译:100米轨道预弯曲自动控制型号的研究与应用

获取原文

摘要

Repeated bending occurs toward the direction of rail head and rail base during the cooling which can lead to significant bending deformation and residual stress after cooling, the longer the rail, the more obvious this phenomenon is. In addition to cooling function, a kind of cooling bed with a pre-bent process will be used in order to solve this problem on 100 meters rail. The synchronous movements on this cooling bed can be realized by the automatic control system after establishing the mathematical model of bending deformation after rolling. The rail is reversely bent toward the rail base before cooling according to the pre-bent control of the pre-bent curve and is straight after cooling which can realize the control of the residual stress after pre-bent and straightening. The straightening residual stress significantly reduced after the pre-bent.
机译:反复弯曲朝向轨道头和轨道底座的方向发生在冷却过程中,冷却后可能导致显着的弯曲变形和残余应力,轨道越长,这种现象越明显。除了冷却功能外,还将使用具有预弯曲过程的一种冷却床,以便在100米的轨道上解决这个问题。在轧制后建立弯曲变形的数学模型之后,可以通过自动控制系统实现该冷却床的同步运动。根据预弯曲曲线的预弯曲控制,冷却,在冷却之前,轨道朝向导轨底倾斜弯曲。冷却后,可以直接在弯曲和矫直后实现残余应力的控制。预弯曲后,矫直残余应力显着降低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号