首页> 外文会议>International Yellow River forum on ensuring water right of the river s demand and healthy river basin maintenance >Banked-up Water Analysis of Bridge Construction Based on Two Dimensional Finite Element Numerical Simulation
【24h】

Banked-up Water Analysis of Bridge Construction Based on Two Dimensional Finite Element Numerical Simulation

机译:基于二维有限元数值模拟的基于二维有限元数值模拟的桥梁施工银行水分分析

获取原文

摘要

Bridge building in the river will raise the river water levels and velocity around the bridge piers and abutment wall,and these will take great effect on river flood control.How to evaluate the water levels increment and effect to river flood is essential for river channel management.Based on the river channel two dimensional finite element numerical model,these effects are analyzed.The main indicators include velocity variation,water stage variation,around bridge piers and abutment wall.By the above data,some results can be made.The maximum water level increment of banked-up water level in front of bridge is 0.21 m height,the data of banked-up water level by empirical formula is 0.25 m.The difference value of maximum banked-up water level is0.04 m,this explains the correspondence and the reasonableness of the two methods.
机译:河的桥梁建筑将提高河流水平和桥墩和邻接墙周围的速度,这些都会对河流防洪很大效果。如何评估水位增量和对河流的效果对河流管理至关重要。基于河道两维有限元数值模型,这些效果被分析。主要指标包括速度变化,水级变化,桥墩和邻接墙周围。通过上述数据,可以制造一些结果。最大水桥前面的银行水位的水平升高为0.21米,通过经验公式的银行水位数据为0.25米。最大银币水位的差值为0.04米,这解释了这两种方法的对应和合理性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号