【24h】

Banked-up Water Analysis of Bridge Construction Based on Two Dimensional Finite Element Numerical Simulation

机译:基于二维有限元数值模拟的桥梁施工水淹分析

获取原文

摘要

Bridge building in the river will raise the river water levels and velocity around the bridge piers and abutment wall,and these will take great effect on river flood control.How to evaluate the water levels increment and effect to river flood is essential for river channel management.Based on the river channel two dimensional finite element numerical model,these effects are analyzed.The main indicators include velocity variation,water stage variation,around bridge piers and abutment wall.By the above data,some results can be made.The maximum water level increment of banked-up water level in front of bridge is 0.21 m height,the data of banked-up water level by empirical formula is 0.25 m.The difference value of maximum banked-up water level is0.04 m,this explains the correspondence and the reasonableness of the two methods.
机译:河道中的桥梁建设会提高河道桥墩和桥台围墙的水位和流速,对河道防洪有很大影响。如何评估水位的增加及其对河道洪水的影响对河道管理至关重要。在河道二维有限元数值模型的基础上,对这些影响进行了分析。主要指标包括速度变化,水位变化,桥墩和桥台围墙等。桥前堆积水位的水位增量为0.21 m高,经验公式的堆积水位数据为0.25 m。最大堆积水位之差值为0.04 m,这说明了对应和两种方法的合理性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号