首页> 外文会议>CMET 2012 >The Calculation method of earth-rock allocation balance and its application for the pumped storage hydropower construction
【24h】

The Calculation method of earth-rock allocation balance and its application for the pumped storage hydropower construction

机译:地球岩分配平衡计算方法及其对泵送水电施工的应用

获取原文

摘要

There is a large number of excavation and filling in the construction of pumped-storage power station, and the filling materials are from the excavated materials. The construction planning is limited by the space, time and quantity, order, and its procedure directly affects the construction schedule. Based on relationships analysis of construction schedule and material quality, quantity and its balance, the spatial coordination of excavation, embankment partition and construction safety distance, three models are established which are excavation volume calculation model, the processing logic model and the excavate-transport-fill analysis model of earth-rock. Also, the dynamic balance and allocation of earth-rock for the main work construction are realized. The case analysis shows that this study will contribute to the management efficiency of project construction.
机译:有大量的挖掘和填充泵送存储电站的构造,填充材料来自挖掘材料。施工规划受空间,时间和数量,订单的限制,其程序直接影响施工时间表。基于施工进度和材料质量的关系分析,数量及其平衡,挖掘,路堤分区和施工安全距离的空间协调,建立了三种模型,即开挖量计算模型,加工逻辑模型和挖掘 - 运输 - 填补土岩分析模型。此外,实现了主要工作结构的动态平衡和地球岩石分配。案例分析表明,该研究将有助于项目建设的管理效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号