首页> 外文会议>nternational Conference on Water Resources Engineering >Murray Darling Basin Sustainable Yields Project: Prioritisation and Assessment Framework for Groundwater
【24h】

Murray Darling Basin Sustainable Yields Project: Prioritisation and Assessment Framework for Groundwater

机译:Murray Darling Basin可持续收益率项目:地下水的优先级和评估框架

获取原文

摘要

Groundwater extraction is highly variable across the Murray-Darling Basin (MDB) with 84 percent occurring within six valleys and the majority of that from a small area of alluvial aquifer in each valley. Accurate groundwater modelling to assess sustainable extraction limits requires detailed data and considerable effort. It is probably only justified for aquifers where there is significant groundwater extraction. A prioritisation scheme is thus appropriate and one has been developed for the Murray Darling Sustainable Yields (MDBSY) project based on Groundwater Management Units (GMUs).Jt enables an appropriate level of effort to be focussed on 20 of the 96 GMUs that account for more than 75 percent of the groundwater use in the MDB. For each priority class, there is a minimum expected assessment standard. This prioritisation scheme has guided the application, adaptation and development of models for the MDBSY project, largely using existing models. Nonetheless, many of the models do not meet the minimum standard suggested by the criteria in the prioritization scheme. This has not prevented the attainment of project objectives, but does mean that some of the conclusions related to sustainable extraction may have lower reliability than desired. There are inconsistencies between the models in relation to calibration and assumptions that make a Basin-wide comparison of response to climate difficult. The prioritisation and assessment framework may have wider application than the MDBSY project, including the identification of knowledge gaps required to meet future policy and management requirements for groundwater in the MDB.
机译:地下水提取在默里 - 达令盆地(MDB)上具有高度变化,六个山谷内发生84%,其中大部分来自每个山谷的冲积含水层。准确的地下水建模以评估可持续提取限值需要详细的数据和相当大的努力。对于有显着的地下水提取的含水层来说,这可能只是合理的。因此,优先级方案是合适的,并且已经为基于地下水管理单位(GMUS)的Murray Darling可持续收益率(MDBSY)项目开发了一个.JT,可以将适当的努力融入96受GMU的20个占据更多超过75%的地下水在MDB中使用。对于每个优先级的类,有一个预期的预期评估标准。此优先级方案引导了MDBSY项目的模型的应用,适应和开发,在很大程度上使用现有模型。尽管如此,许多模型不符合优先级方案标准所建议的最低标准。这并未阻止实现项目目标,但这意味着与可持续提取有关的一些结论可能与所需的可靠性较低。模型与校准和假设有关的模型之间存在不一致,这使得池对气候的响应难以进行困难。优先级和评估框架可能具有比MDBSY项目更广泛的应用,包括确定所需知识差距,以满足MDB中地下水的未来政策和管理要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号