首页> 外文会议>International Conference on Intelligent Computing and Applications >Simultaneous Scheduling of Machines and Tools Considering Tool Transfer Times in Multimachine FMS Using CSA
【24h】

Simultaneous Scheduling of Machines and Tools Considering Tool Transfer Times in Multimachine FMS Using CSA

机译:考虑使用CSA的多机芯FMS中的工具传输时间的机器和工具同时调度

获取原文

摘要

This article addresses simultaneous scheduling of machines and tools considering tool transfer times between machines, to produce best optimal sequences that minimize makespan in a multimachine flexible manufacturing system (FMS). The performance of FMS is expected to improve by effective usage of resources, proper amalgamation and synchronization of their scheduling. Crow search algorithm (CSA) is a potent tool which is a better choice to solve optimization problems like scheduling. The proposed heuristic is tested on various problems with makespan as objective, and the results are compared with results of existing methods. The results show that CSA has outperformed.
机译:本文解决了考虑机器之间的工具传输时间的机器和工具的同时调度,以产生最佳的最佳序列,最小化多孔柔性制造系统(FMS)中的MEPESPHAN。预计FMS的性能预计通过有效使用资源,适当的合并和调度同步来改善。乌鸦搜索算法(CSA)是一个有效的工具,是更好的选择,可以解决像调度等优化问题。拟议的启发式在Makespan作为目标的各种问题上进行了测试,结果与现有方法的结果进行了比较。结果表明,CSA已经表现优于。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号