首页> 外文会议>Global Conference on Civil, Structural and Environmental Engineering >Technology of Precasting and Installing for Integral Segment in Composite Girder Cable-stayed Bridge
【24h】

Technology of Precasting and Installing for Integral Segment in Composite Girder Cable-stayed Bridge

机译:复合梁斜拉桥积分段预制和安装技术

获取原文

摘要

The main bridge of Quanzhou Bay Sea-Crossing Bridge is a composite girder cable-stayed bridge with span arrangement (70+130+400+130+70)m and with double pylongs,separated decks.It's the first time to using the dry joints assembly in composite girder cable-stayed bridge,the technology of precasting and installing for integral segment is introduced.
机译:泉州湾海关桥的主要桥梁是一种复合梁斜拉桥,跨度排列(70 + 130 + 400 + 130 + 70 + 70),双幽门,分离的甲板。这是第一次使用干接头介绍了复合梁斜桥中的组装,介绍了整体段预制和安装技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号