首页> 外文会议>Global Conference on Civil, Structural and Environmental Engineering >The Follow-up Assessment Of effect of Pilot Test of Steam Flooding in Jin 45 Block
【24h】

The Follow-up Assessment Of effect of Pilot Test of Steam Flooding in Jin 45 Block

机译:金45块蒸汽洪水试验试验试验效果的后续评价

获取原文

摘要

The steam flooding pilot test in Jin 45 block has steam flooding 4 years since June 2008 turned the drive. But now, it still don't understand the production dynamic, the degree of use of the reservoir, the effect of development of this pilot and the situation of temperature field, pressure field and saturation distribution field. Now petrel and CMG software are applied for the tracking simulation, on the basis of optimization of injection-production parameters, put forward effective adjustment scheme for the forecast of steam flooding. The results show that: at present, test is in displacing stage, after two adjusted in 2010 and 2011, the daily fluid and daily oil increased, moisture content decreased. The using of the layer of I35 is obvious. The using of the 1, 2 small layers of I group is high, the 4 small layer is low, the using of plane is great different. The pilot test of steam flooding in Jin 45 block has achieved good development effect, it offers an important basis for determining to replace mining mode of the later stage of cyclic steam stimulation of reservoir.
机译:Jin 45 Block的蒸汽泛洪试验试验有4年的蒸汽洪水,自2008年6月开始转动驱动器。但是现在,它仍然不了解生产动态,水库的使用程度,这种飞行员的发展的影响以及温度场的情况,压力场和饱和分布场。现在,在注射生产参数的优化的基础上,Petrel和CMG软件应用于跟踪仿真,提出了蒸汽洪水预测的有效调整方案。结果表明:目前,试验处于置换阶段,经过两次调整,2010年和2011年调整后,日常液体和日常油增加,水分含量下降。 i35层的使用是显而易见的。使用1,2小层的I组很高,4个小层低,飞机使用很大。晋蒸汽洪水的试验试验率取得了良好的开发效果,为确定替代水库循环蒸汽刺激后期阶段的采矿模式提供了重要的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号