首页> 外文会议>Global Conference on Civil, Structural and Environmental Engineering >Block Element Method for Seepage/Stress coupling in Fractured Rock Foundation of Gravity Dam
【24h】

Block Element Method for Seepage/Stress coupling in Fractured Rock Foundation of Gravity Dam

机译:重力坝裂缝岩基础渗流/应力耦合的块元件方法

获取原文
获取外文期刊封面目录资料

摘要

The uplift pressure on the foundation surface is one of the unfavorable factors for the stability of a gravity dam. The seepage/stress coupling character in the rock foundation may make the change of the seepage field which can lead to the change of the value of uplift pressure. In this paper, the seepage/stress coupling in fractured rock masses is studied by the two fields across iterative method with the help of block element method. A gravity dam is studied and the numerical analysis results show that the normal stress can affect the seepage character of rock masses greatly. In the region of high pressure stresses, the transmissivity deduces which can bring about the increment of gradient and velocity. This will bring an adverse impact on the stability of the dam. The coupling of seepage and stress in fractured rock foundation cannot be ignored in arithmetical analysis.
机译:基础表面上的隆起压力是重力坝稳定性的不利因素之一。岩石基础中的渗流/应力耦合特性可以使渗流场的变化变化,这可能导致升压压力值的变化。在本文中,在嵌段元件方法的帮助下,两个字段研究了裂缝岩体中的渗漏/应力耦合。研究了重力坝,数值分析结果表明,正常的应力会大大影响岩体的渗流特征。在高压应力的区域中,透射率推断,这可以带来梯度和速度的增量。这将对大坝稳定产生不利影响。在算术分析中,在裂缝岩基上的渗流和应力的耦合不能忽视。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号