Timing Analysis on Rock-bolted Crane Beam of the Underground Power House ofJinping II Hydropower Station

机译:近二水电站地下动力屋岩锚式起重机梁的定时分析

获取原文

摘要

According to design requirements, to reduce the construction difficulty for crane beam on rock wall in underground main power house of Jinpingll hydropower, and to condense construction time limit for a main building, theconcreting time for crane beam on rock wall is needed to be specially analyzed. As the property of Jinpingll hydropower station is under high field stress, numeric analysis uses rock mass deterioration constitutive model RDM. Considering the special mechanics behavior between concrete and rock wall, softening element and interface element are used respectively to make the simulation. By analyzing the stress for different placement times of crane beam of main house, it is shown that placement timing has certain extent effect on upper stress of crane beam. As a result, in order to assure stability of constructing and operating periods of crane beam, the calculation and analysis suggest that the concreting should be after the third excavation, but certain structural joint need to be installed.
机译:根据设计要求,减少岩墙上的岩墙上的岩墙上的施工难度,并对主楼的施工时间限制进行​​冷凝,需要特别分析岩壁上起重机梁的时间。 。随着金平水电站的性质在高场应力下,数值分析使用岩体质量劣化本构模型RDM。考虑到混凝土和岩壁之间的特殊力学行为,分别使用软化元件和界面元件进行仿真。通过分析主房屋起重机梁的不同放置时间的应力,显示放置定时对起重机梁的上应力产生了一定的影响。结果,为了确保稳定性的起重机梁的构造和运行期,计算和分析表明,混凝土应在第三次挖掘之后,但需要安装某些结构关节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号