首页> 外文会议>IASTED international conference on power and energy systems and applications >UNCERTAINTY COSTS OF WIND POWER GENERATION CONSIDERING EXPECTED ENERGY NOT SUPPLIED UNDER DIFFERENT SPINNING RESERVE LEVELS
【24h】

UNCERTAINTY COSTS OF WIND POWER GENERATION CONSIDERING EXPECTED ENERGY NOT SUPPLIED UNDER DIFFERENT SPINNING RESERVE LEVELS

机译:考虑在不同纺纱储备水平下未提供的预期能量的风力发电不确定性成本

获取原文

摘要

This paper presents the algorithm which includes the uncertainty of the wind power generation in the conventional unit commitment problem. The wind power uncertainty in each hour is considered as a normal distribution curve along the wind power forecast. The index used to determine the effect the wind power uncertainty has on the system is the cost of Expected Energy Not Supplied (EENS) which is added to the system operation cost. The spinning reserve according to wind power uncertainty is added at different levels as percentages of the wind power installed capacity. The algorithm is tested on the system with five thermal generators and the wind power penetration is assumed to be 25% of total generation. The study gives the minimum total cost which is the summation to generation operating cost, reserve cost and EENS cost.
机译:本文介绍了传统单位承诺问题中风力发电的不确定性的算法。每小时的风能不确定性被认为是沿风电预测的正态分布曲线。用于确定效果的指数风电不确定性对系统的成本是未提供的预期能量(Eens)的成本,该设备被添加到系统运行成本中。根据风能不确定性的纺纱储备在不同的水平下添加,作为风电量安装能力的百分比。该算法在具有五个热发电机的系统上进行测试,并且假设风力渗透为总生成的25%。该研究提供了最低总成本,即发电运营成本,储备成本和Eens成本的总和。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号