首页> 外文会议>International Symposium on Chemical Engineering and Material Properties >Maintenance Project Scheduling Model Considered Flexible Resource with Capability Difference
【24h】

Maintenance Project Scheduling Model Considered Flexible Resource with Capability Difference

机译:维护项目调度模型认为具有能力差异的灵活资源

获取原文

摘要

Maintenance task scheduling during mission break is described as flexible resource constraint project scheduling problem, and flexible resource constraint maintenance task scheduling model is established. Since capability level of flexible resource is different, the thesis establishes maintenance task scheduling model considering capability difference. To resolve the model, a particle swarm optimization (PSO) algorithm based on activity list is presented. At last, a case study is present.
机译:任务中断期间的维护任务调度被描述为灵活的资源约束项目调度问题,并且建立了灵活的资源约束维护任务调度模型。由于灵活资源的能力水平是不同的,本文建立了考虑能力差异的维护任务调度模型。要解决模型,介绍了基于活动列表的粒子群优化(PSO)算法。最后,存在案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号