Optimal placement of a defined number of Phasor Measurement Units in power systems

机译:功率系统中定义数量的相量测量单元的最佳位置

获取原文

摘要

Nowadays, in real power systems in most countries around the world, common measurement units and SCADA systems are used for data measurement and state estimation. Some Electricity Companies have installed and applied Phasor Measurement Units (PMUs) for system observability. Nevertheless, number of Phasor Measurement Units might be limited due to financial considerations and this limited number may be used together with common measuring systems. Thus, this paper provides a novel method for optimal placement of a limited number of phasor measurement units. Two main problem are discussed in this paper: one is placement of a limited number of phasor measurement units in case the units are less than the minimum number required for the system to be observable, and the other is placement of phasor measurement units in case the units are more than the minimum number required for the system to be observable. The first scheme takes into account the system observability in presence of Phasor Measurement Units, minimizing state estimation error and considering future supplementary plan, and also determining candidate buses for installing PMUs in future. While, the second one, takes into account maximizing measuring system reliability with an increase in redundancy of these measurement units and also determining candidate buses for installing PMUs in future. The proposed method has been simulated and analyzed on the 400 kv khorasan 17 bus network in Iran and the results show the efficiency of the method.
机译:如今,在世界各地的大多数国家的实际电力系统中,公共测量单位和SCADA系统用于数据测量和状态估计。一些电力公司已安装并应用相量测量单位(PMU)以进行系统可观察性。然而,由于财务考虑因素,可能限制相量测量单元的数量,并且该有限的数量可以与普通测量系统一起使用。因此,本文提供了一种用于最佳放置有限数量的相量测量单元的新方法。本文讨论了两个主要问题:在单位小于要观察到的系统所需的最小数量的情况下,一个是放置有限数量的相量测量单元,另一个是在情况下放置相量测量单元单位超过系统可观察所需的最小数量。第一种方案考虑了在相分测量单元的存在下的系统可观察性,最小化状态估计误差并考虑到未来的补充计划,以及将来的候选总线确定用于安装PMU的候选总线。虽然,第二个,在这些测量单元的冗余增加以及确定未来安装PMU的候选总线的冗余,但是最大化测量系统可靠性。在伊朗的400 kV Khorasan 17总线网络上模拟和分析了该方法,结果显示了该方法的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号