首页> 外文会议>International conference on railway engineering >FLAC SIMULATION ANALYSIS ON SHIELD TUNNEL CUTTING PILE FOUNDATION OF BRIDGE AT TRAVERSING AREA
【24h】

FLAC SIMULATION ANALYSIS ON SHIELD TUNNEL CUTTING PILE FOUNDATION OF BRIDGE AT TRAVERSING AREA

机译:堤防隧道沿线桥梁桩基桩基础的FLAC仿真分析

获取原文

摘要

Regarding the problem of shield runnel cutting pile foundation of bridge at traversing area,a calculation model is established consistent to actual supporting design using FLAC 3D numerical simulation software.Analysis of load bearing state of the piles is performed to obtain different stresses of piles of bridge foundation and ground surface deformation with the support of underpinning piles when shield tunnelling traversing and cutting pile foundation of the bridge.The simulation results show that the suggested treatment plan is feasible and it can ensure the stability of bridge during shield tunnelling construction, and it meets the control requirements of ground surface deformation, which can provide reference for similar projects.
机译:关于横舷的屏蔽锚桩基础的问题,使用FLAC 3D数值模拟软件一致地建立了一种计算模型,与实际支持设计一致。进行桩承载状态的分析,以获得堆积桩的不同应力基础和地面变形随着盾构隧道挖掘和切割桥梁的桥梁桩基桩的支撑。仿真结果表明,建议的治疗计划是可行的,它可以确保屏蔽隧道施工期间桥梁的稳定性地面变形的控制要求,可以为类似项目提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号