首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Modification to the FIDIC Silver Book in a Buyer's Market Context: A Case Study of the HaiPhong Power Plant II Project
【24h】

Modification to the FIDIC Silver Book in a Buyer's Market Context: A Case Study of the HaiPhong Power Plant II Project

机译:在买方市场背景下修改Fidic Silver Book:以海宏电厂II项目为例

获取原文

摘要

With more and more emerging contractors from developing economies struggling to enter the global market eagerly pursuing new jobs, both incumbent and new entrants have to confront a fierce market competition and suffer from a declining bargaining power when dealing with the owner. FIDIC contract conditions, although originally formulated to provide a relatively fair baseline in construction transaction setting are then often modified in favor of the owner in practice. This study identified and classified modifications in the turnkey contract of the HaiPhong Power Plant II project located in HaiPhong, Vietnam and assessed these modification categories in terms of frequency and risk allocation. The case study provided evidence and lessons-learned in association with contract modification and redesign regarding the widely applied FIDIC Silver Book conditions for academics, practitioners and professional associations involved in international construction business.
机译:随着越来越多的新兴的承包商,发展中的经济体努力进入全球市场急切地追求新就业机会,既有现任和新的进入者都必须面临激烈的市场竞争,并在与所有者打交道时遭受谈判能力下降。 FIDIC合同条件,虽然最初制定在建筑交易环境中提供相对公平的基线,但经常被修改在实践中支持所有者。 本研究确定了位于海防,越南的海防电厂II项目的交钥匙合同中的分类修改,并在频率和风险分配方面评估了这些修改类别。 案例研究提供了证据和经验教训 - 与合同修改和重新设计有关国际建筑业务所涉及的学术界,从业者和专业协会的广泛应用迷信银书条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号