首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Study on Temperature Control Method of Yeywa Hydropower Station RCC Dam Construction
【24h】

Study on Temperature Control Method of Yeywa Hydropower Station RCC Dam Construction

机译:Yeywa水电站RCC坝施工温度控制方法研究

获取原文

摘要

Yeywa hydropower station RCC dam is located in the torrid zone of Asian, During the construction period, it meet Technical problem of temperature control in hot season. We can utilize the peculiarity of RCC that has a slow temperature rise due to hydration heat and a low early strength, according to analyse the blending and concreting procedure of RCC, adopt comprehensive and effective temperature control method, such as confirm concrete mix, control the temperature of raw material and RCC out of the batch plant, prevent temperature rise during transporting and concreting, setting joint to avoid structural crack and temperature crack. From Yeywa hydropower station RCC dam construction finished to now, no dangerous crack is detected, It accumulate experiences for RCC dam construction in high temperature place.
机译:Yeywa水电站RCC DAM位于亚洲的热源区,在施工期间,它符合炎热季节温度控制的技术问题。我们可以利用RCC的特殊性,由于水化热量和较低的早期强度,对RCC的混合和混凝剂进行了较低的升温,采用全面且有效的温度控制方法,如确认混凝土混合,控制批量生料的原料温度和RCC出,防止在运输和混凝土过程中升温,设定接头以避免结构裂缝和温度裂纹。从Yeywa水电站RCC水电站建设完成到现在,没有检测到危险裂缝,它积累了高温坝上RCC大坝施工的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号