Calculation for settlement of high cap extra-long large diameter pile Groups

机译:高帽超长大直径桩基沉降的计算

获取原文

摘要

The settlement of high cap extra-long large diameter pile groups is made up of pile elastic compression and settlement of soil layers under pile end in theory. Methods to calculate pile compression of high cap extra-long large diameter pile groups was deduced or listed. Six methods to calculate settlement of soil layers under pile end were expounded through extra-long large diameter pile groups under south tower of main bridge of Sutong Yangtse River Highway Bridges. The results show that piles' elastic compression should be calculated into the settlement of extra-long large diameter pile groups, including that caused by pile's own weight, and it is little difference between test value and total settlement which is composed of piles' elastic compression calculated through the formula deduced in the paper and theoretic settlement of soil layers under pile end based on Mindlin's additional stress solution, only making 0.06% lower.
机译:高帽超长大直径桩基的沉降是由理论下桩端下土层的桩弹性压缩和沉降构成。推导或列出了计算高帽超长大直径桩基桩压缩的方法。通过萨贡长江公路桥梁主桥南塔的超长大直径桩基来阐述六种计算桩端下土壤层沉降的方法。结果表明,桩的弹性压缩应计算成超长大直径桩基的沉降,包括桩自身重量引起的,试验值与总沉降之间的差异很小,由桩的弹性压缩组成通过纸张造纸纸和理论沉降的公式计算,基于Mindlin的额外压力解决方案,仅降低0.06%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号