首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >The Calculation Method of Basic Reserve Fund in Power Grid Construction Project: A Case Study From China
【24h】

The Calculation Method of Basic Reserve Fund in Power Grid Construction Project: A Case Study From China

机译:电网建设项目基本储备基金计算方法 - 以中国为例

获取原文

摘要

This paper studied the calculation method of basic reserve fund (BRF) based on distribution fitting and Monte Carlo Simulation (MCS) in power grid construction project (PGCP). BRF copes with the various unforeseen expenses in the process of budget compilation. Nowadays, the measuring method with fixed rate cannot adapt to the request, because of the BRF with larger uncertainty influence factors. MCS technique can achieve a good simulation to solve the problem of uncertainty. The research first uses MINITAB to analysis the distribution of various influence factors, then uses MATLAB to build calculation model to take the stochastic simulation for many times, finally gets a more realistic BRF. A case from China is used to confirm this calculation method works well.
机译:本文研究了基于分配拟合和蒙特卡罗模拟(PGCP)的基础储备基金(BRF)的计算方法(PGCP)。 BRF与预算汇编过程中的各种不可预见的费用。如今,由于具有较大不确定性影响因素的BRF,具有固定速率的测量方法不能适应请求。 MCS技术可以实现良好的模拟以解决不确定性的问题。该研究首先使用Minitab分析各种影响因素的分布,然后使用MATLAB来构建计算模型多次拍摄随机仿真,终于获得了更现实的BRF。来自中国的案例用于确认此计算方法运行良好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号