Breakage Probability Calculation of Shield Tunnel under the Effect of Foundation Pit Excavation

机译:基坑挖掘效果下盾构隧道破裂概率计算

获取原文
获取外文期刊封面目录资料

摘要

The excavation of foundation pit will change the initial stress state in surrounding soils, which induce the superimposed stress and uneven settlement to the adjacent existing tunnels. Based on the pit excavation engineering in Shenyang, which sits atop the existing tunnels, the risk factors and failure type of shield segment lining were studied through risk analysis theory. According to the uncertainty and spatial variability of soil parameters, the risk accident of existing tunnel was calculated by means of stochastic finite element which is combined Monte Carlo simulation with FEM. The risk of existing tunnel during the pit excavation stage was evaluated respectively under multi-failure patterns. The framework is used to estimate and minimize risks at pit excavation engineering in Shenyang.
机译:基础坑的挖掘将改变周围土壤中的初始应力状态,诱导叠加的应力和对邻近现有隧道的不均匀沉降。基于沉阳的坑开挖工程,坐落在现有隧道上,通过风险分析理论研究了盾构段衬里的危险因素和故障类型。根据土壤参数的不确定性和空间变异,通过随机有限元计算了现有隧道的风险事故,其与FEM的蒙特卡罗模拟组合。在多功能模式下分别评估坑开挖阶段现有隧道的风险。该框架用于估计和最大限度地减少沉阳坑开挖工程的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号