Stability and Deformation Analysis for Excavation and Backfilling of Fushun West Open-pit Coal Mine

机译:抚顺西坑煤矿挖掘与回填的稳定性与变形分析

获取原文

摘要

Taking section W400 of Fushun west open-pit coal mine for the research, the interface model of fracture zone and surrounding rock was established. FLAC~(3D) is used to analysis the influence of excavation and backfill of open-fit coal mine to the slope stability and deformation. The numerical results and analysis show that: (1) when the open-pit coal mine slope is excavated to final production line, the safety coefficient is 2.98, with the excavation, the deformation of the Fushun No.1 Refinery Factory area increases. (2) With the increase of backfilling, the slope coefficient increases to 3.32, this will reduce the deformation of the Fushun No.1 Refinery Factory area. Furthermore, the positions of the dangerous slip surface and serious deformation part of factory area should be regards as key areas. These conclusions could provide technical basis for the stability analysis of Fushun west open-pit coal mine.
机译:建立了研究抚顺西露坑煤矿的W400,建立了骨折区与周围岩石的界面模型。 FLAC〜(3D)用于分析开放式煤矿的挖掘和回水对坡稳定性和变形的影响。数值结果和分析表明:(1)当露天煤矿斜坡挖掘到最终生产线时,安全系数为2.98,随着挖掘,抚顺1号炼油厂的变形增加。 (2)随着回填的增加,坡度系数增加到3.32,这将减少抚顺1号炼油厂地区的变形。此外,危险滑动表面和工厂面积严重变形部分的位置应视为关键区域。这些结论可以为抚顺西露坑煤矿稳定分析提供技术基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号