Seepage Calculation and Analysis of the Upstream Earth-Rock Cofferdam of the Pinecone Hydropower Station

机译:PineCone水电站上游地球岩围堰渗流计算与分析

获取原文

摘要

The upstream cofferdam of the Pinecone Hydropower Station was an upstream earth-rock cofferdam built on the deep overburden layer of upstream foundation pit, which has many characteristics such as big reservoir capacity in front of the cofferdam, deep foundation pit behind the cofferdam and long anti-seepage time. In order to provide reference and a basis for seepage control construction, the sensitivity analysis on permeability coefficients of the seepage control system was made to analyze the seepage characteristics of upstream cofferdam at design water level and to discuss the permissible value range of permeability coefficients. The calculation results show that correct and reasonable seepage control measures are able to realize an effective control of the seepage field. Besides, the engineering design parameters are obtained when the optimization analysis on permeability coefficients meets the seepage control requirements, and thus provide the basis for engineering optimization design.
机译:PineCone水电站的上游围堰是一个上游的地球岩石围堰,建于上游基坑的深层覆盖层,这在围堰前面的水库容量等许多特点,围堰背后的深基坑和长期抗 - 时间。为了提供渗流控制结构的参考和基础,对渗流控制系统的渗透系数进行灵敏度分析,以分析设计水位上下游围堰的渗流特性,并讨论渗透系数的允许值范围。计算结果表明,正确合理的渗流控制措施能够实现渗流场的有效控制。此外,当对渗透系数的优化分析符合渗流控制要求时,获得了工程设计参数,从而为工程优化设计提供了基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号