Rapid Excavation Research of Half Coal Rock Lane in Liu-wan Mine

机译:刘万矿半煤炭巷快速开挖研究

获取原文

摘要

In order to solve the question of excess or under excavation, poorly forming around the lane, low rate of excavation caused by less drilling, arbitrarily drilling, non-standard charging, unreasonable initiation network in the construction process of half coal rock lane in Liu-wan mine. According to coal and rock conditions at the scene and through theoretical calculations and engineering analogy, made a scientific and rational borehole layout and correct initiation network, strengthened temporary support and changed operation modes. The driving rate of the single circulation was improved from 1.6m to max.2.75m. The utilization rate of the blasting boreholes was improved from 89% to previous 94.7%. The unit consumption of explosives was significantly reduced from the original 1.24kg/m~3 minimum to 0.74 kg/m~3.Thus the profile shape results would be good and the driving speed could be highly increased. Research results will be the same geological conditions for excavating to provide reference.
机译:为了解决挖掘过剩或挖掘的问题,围绕车道形成不良,挖掘,任意钻井,非标准充电,无理发起网络的施工过程中的较低,开挖率低,刘 - 万矿。根据现场的煤炭和岩石条件,通过理论计算和工程类比,制作了科学和理性的钻孔布局和正确的启动网络,加强了临时支持和改变的操作模式。单循环的驱动速率从1.6米提高到MAX.2.75M。喷砂钻孔的利用率从89%提高到之前的94.7%。从原始的1.24kg / m〜3最小到0.74kg / m〜3.thus的单位爆炸物的用量显着降低到0.74kg / m〜3.本轮廓形状结果是良好的,并且驱动速度可能会高度增加。研究结果是挖掘提供参考的相同地质条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号