首页> 外文会议>International Conference on Structures and Building Materials(ICSBM) >Research on supporting technology of roadway driving along next goaf of second mining strip pillar
【24h】

Research on supporting technology of roadway driving along next goaf of second mining strip pillar

机译:第二次采矿柱柱沿巷道驾驶支持技术研究

获取原文

摘要

For roadway driving along next goaf of strip pillar second mining, being influenced by the abutment pressure of previous coal mining face and main roof breaking rotary deformation, the surrounding rock deformation is serious and the control effect of ordinary bolt supporting on the general stability of roadway driving along next goaf is poorer. According to the concrete geological and technique condition of the 2351 second mining strip pillar in Daizhuang Colliery, adopting the united support pattern combined high strength bolt of levorotatory continuous thread and anchor of low relaxation prestress, the safety of the roadway can be ensured and the stability of the roadway surrounding rocks can be improved. It is of significant reference meaning for bolting support of roadway driving along next goaf of second mining strip pillar under similar condition.
机译:对于沿着地带柱子的下一个挖掘的巷道驾驶,受到先前煤炭矿面的邻接压力和主屋顶破坏旋转变形的影响,周围的岩石变形是严重的,普通螺栓支撑对道路一般稳定性的控制效果沿着下一个Goaf驾驶更穷。根据大寨煤炭的2351次采矿支柱的具体地质和技术条件,采用联合支援模式的高强度螺栓,低松弛预应力的锚杆,可以确保道路的安全性和稳定性围绕岩石的巷道可以改善。在类似条件下,对于沿着第二型矿区柱的下一条脱落的道路驾驶的挖掘支撑是具有重要意义的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号