首页> 外文会议>International Conference on Structures and Building Materials(ICSBM) >Numerical simulation of pumping well-underground concrete wall-recharging well in dewatering of deep foundation pit
【24h】

Numerical simulation of pumping well-underground concrete wall-recharging well in dewatering of deep foundation pit

机译:深基坑脱水泵浦地下混凝土墙体再充电的数值模拟

获取原文

摘要

With the foundation pit of south air shaft nearby Qiantang River, Subway No.1, Hangzhou, Zhejiang province as an example, the interaction between pumping wells and underground concrete wall, together with the soft curtain formed by recharging wells are simulated with numerical method. The results indicate that the proper position of filter tube of pumping well to underground concrete wall can reduce the drawdownoutside pit, and the drawdown outside pit can be reduced by recharging curtain.
机译:随着南方河附近的基坑,地铁1号,杭州,浙江省地铁1号为例,用数值方法模拟泵浦井和地下混凝土墙之间的相互作用与通过再充电井形成的软帘。结果表明,泵送到地下混凝土墙上的滤料管的适当位置可以减少拉出窗帘,可以通过再充电窗帘减少坑外的绘图。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号