The purpose of the work was to analyze the exploitation of the collective water supply system (CWSS), on the example of Czudec, Podkarpackie CWSS. The water balance was prepared. The system operation was simulated using the Epanet software. The obtained data was presented in graphical form of pressure distribution on the network during the minimum and maximum demand. Water age simulations were also prepared, that is, the period of water residence in water distribution subsystem.
展开▼