首页> 外文会议>International Conference on Energy and Environmental Protection >Experimental Study on Zinc Leaching of Blast Furnace Gas Ash by Ammonia Leaching
【24h】

Experimental Study on Zinc Leaching of Blast Furnace Gas Ash by Ammonia Leaching

机译:氨浸出的高炉煤气灰锌浸出的实验研究

获取原文

摘要

Blast furnace gas ash is one of the main solid wastes in iron and steel enterprise. The recovery of zinc from gas ash can result in considerable economic and environmental benefits. The effect of NH_3/NH_4~+, L/S, [NH_3]_T and leaching time on the zinc leaching rate of blast furnace gas ash by using ammonia leaching process had been investigated in this paper. The results show that L/S and NH_3/NH/ are the main influence factors under the experimental condition. The optimal conditions for leaching process are: NH_3/NH_4~+=2:1, L/S=4:l, [NH_3]t =5mol/L, and the leaching time is 3 hours. The zinc leaching rate is 82.84% under the optimized conditions. The lead content in leaching solution is high, so the main task is to improve the removal rate of lead in the purification process.
机译:高炉煤气灰是钢铁企业的主要固体废物之一。来自煤气灰锌的锌可导致相当大的经济和环境效益。本文研究了NH_3 / NH_4 +,L / S,[NH_3] _T和浸出时间对高炉煤气灰锌浸出速率的影响。结果表明,L / S和NH_3 / NH /是实验条件下的主要影响因素。浸出过程的最佳条件是:NH_3 / NH_4〜+ = 2:1,L / S = 4:L,[NH_3] T = 5mol / L,浸出时间为3小时。在优化条件下,锌浸出率为82.84%。浸出溶液中的铅含量高,因此主要任务是提高净化过程中铅的去除率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号