首页> 外文会议>Powertest Confetence >Understanding and Implementing the ANSI/NETA ECS-2015 Standard for Electrical Commissioning Specifications
【24h】

Understanding and Implementing the ANSI/NETA ECS-2015 Standard for Electrical Commissioning Specifications

机译:理解和实施ANSI / Neta ECS-2015用于电气调试规范标准

获取原文
获取外文期刊封面目录资料

摘要

One of the more common problems found during energization or system loading, is the misoperation of differential protection. If the equipment was only acceptance tested and the components tested individually without looking at the protection system as a whole, it would be easy to miss a design error or setting error especially on more complex protection schemes. This can be easily avoided with proper commissioning. Simple primary injection tests of differential protection circuits will verify correct connection and settings of the protection scheme. By defining the commissioning process, the NETA ECS will help guide the owner and the commissioning team to work together to develop the OPR, BOD, and commissioning plan. It is important to note the commissioning work starts early in the project and continues throughout the project. Fundamental documents such as the OPR and BOD, are valuable tools that should be the focus of commissioning tests.
机译:在激励或系统负载期间发现的更常见问题之一,是差分保护的误操作。如果设备仅接受测试并且单独测试的组件整体上单独测试,则会容易地错过设计错误或设置错误,尤其是在更复杂的保护方案上。正确调试可以轻松避免这种情况。差分保护电路的简单初级注射测试将验证保护方案的正确连接和设置。通过定义调试过程,Neta ECS将帮助指导所有者和调试团队共同努力,以制定OPR,BOD和调试计划。重要的是要注意项目在项目的早期开始,并在整个项目中持续。基本文件如OPR和BOD,是有价值的工具,应该是调试测试的重点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号