首页> 外文会议>Greenhouse Gas Strategies in a Changing Climate Conference >Next Generation Climate Action Plans - Are They Ready for CEQA Compliance?
【24h】

Next Generation Climate Action Plans - Are They Ready for CEQA Compliance?

机译:下一代气候行动计划 - 他们为CEQA合规准备了吗?

获取原文

摘要

BAAQMD's extensive review of CAPs has led to the conclusion that the CAP's implementation and monitoring mechanisms are critical to the ability of future projects to tier off the CAP's environmental review. In order to take advantage of the tiering benefit and avoid environmental review for GHG impacts, the project proponent must be able to demonstrate that the CAP is being fully implemented, and that the project is consistent with the CAP (meaning that all applicable mandatory and voluntary mitigation measures contained in the CAP are being included in the project's design). BAAQMD therefore recommends to local agencies that CAP implementation strategies include: annual reporting on the implementation of all mitigation measures in the plan; periodic (every 3-5 years) updates to the GHG inventory; and a compliance checklist or similar mechanism for projects to demonstrate consistency with the CAP. The cities of San Francisco and Vallejo have developed such checklists, which will also facilitate their annual reporting on CAP implementation.
机译:Baaqmd对Caps的广泛审查导致了结束的实施和监测机制对未来项目能力达到CAP环境审查的能力至关重要。为了利用分层福利并避免对温室气体影响的环境审查,项目推荐人必须能够证明上限正在全面实施,并且该项目与上限一致(这意味着所有适用的强制性和自愿的帽中包含的缓解措施被列入项目的设计中)。因此,Baaqmd建议将CAP实施战略的当地机构包括:关于实施计划中所有缓解措施的年度报告;定期(每3 - 5年)更新GHG库存;以及符合要求的符合要求或类似机制,用于展示与帽一致的一致性。旧金山和瓦莱霍的城市开发了这样的清单,也将促进其关于CAP实施的年度报告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号