首页> 外文会议>International Conference on Industry, Information System and Material Engineering >An Analysis on Key Problems of Safety Assessment of High Risk Operations in Hydroelectric Project
【24h】

An Analysis on Key Problems of Safety Assessment of High Risk Operations in Hydroelectric Project

机译:水电站高风险行动安全评估关键问题分析

获取原文

摘要

It is of great necessity to carry out safety assessment of high risk operations in hydroelectric projects. We analyze the key problems of safety assessment of high risk operations. Specifically, a questionnaire can be designed by applying the method of Failure Mode and Effects Analysis (FMEA) firstly; then the factors and consequences of risks in such operations can be generated by the questionnaire and interviews; further, the relationship among those factors can be determined based on statistical analysis, and a comparison matrix of Analytic Network Process can be constructed accordingly to verify and modify the model for safety assessment; finally, based on the outcome of safety assessment, the weak point in the hydroelectric project can be revealed and monitor, so that the safety of the project can be improved.
机译:在水力发电项目中对高风险行动进行安全评估是很大的必要条件。我们分析了高风险运营安全评估的关键问题。具体地,可以通过首先应用故障模式和效果分析(FMEA)来设计调查问卷;然后,这些行动中风险的因素和后果可以由问卷和访谈产生;此外,可以基于统计分析确定这些因素之间的关系,并且可以相应地构建分析网络过程的比较矩阵,以验证和修改安全评估模型;最后,根据安全评估的结果,可以揭示水电项目的弱点和监测,以便可以提高项目的安全性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号