首页> 外文会议>Society of Petroleum Engineers Reservoir Characterisation and Conference and Exhibition >Integration of Fiber Optic Enabled Coiled Tubing System with Multiphase Production Logging Tool for Remedial Work Candidate Evaluation
【24h】

Integration of Fiber Optic Enabled Coiled Tubing System with Multiphase Production Logging Tool for Remedial Work Candidate Evaluation

机译:具有多相生产测井工具的光纤卷绕管系统的集成,以进行补救工作候选评估

获取原文

摘要

Multiphase production logging is essential to identify the contribution of different zones, types of fluids produced and other production related issues in producing wells. Data collected is used to determine if the well requires other services to enhance production or isolate unwanted zones. Locating water production and cross flow between thief zones are common problems for carbonate formations. Remedial well services require costly multiple mobilizations of wireline, coiled tubing (CT) and stimulation units. Results might not be accurate due to the time gap between identifying the problem and implementing the action. The new fiber optic enabled coiled tubing (FOECT) system supports many well intervention services, such as production logging, water shut-offs and/or acid stimulations with a single CT string. Combining FOECT with a real-time multiphase production logging tool (MPLT) reduces well downtime and improves remedial service quality control. Downtime is reduced by using the same surface equipment of FOECT to perform multiphase logging and also remedial work. Only the required bottom-hole assembly (BHA) needs to be changed. This successful logging job for Saudi Aramco allows evaluating remedial well services to be planned right after the production logging job to maximize quality control. This paper documents the implementation of the FOECT system with real-time MPLTs and demonstrates the following improvements for the Ghawar field: 1. First time in a Saudi FOECT system and MPLTs were used to log a wet oil producer well for immediate evaluation of remedial work needed. 2. Significant reduction of well downtime by eliminating multiple mobilizations of wireline, CT and pumping units. 3. Established best practices for production logging with FOECT and multiphase tools, including equipment rig up and single acquisition system setup. 4. Optimize the required equipment by eliminating the electric line (e-line) logging unit.
机译:多相生产测井对于确定不同区域的贡献至关重要,生产井产生的流体类型和其他生产相关问题。收集的数据用于确定井是否需要其他服务来增强生产或隔离不需要的区域。定位水生产和小偷区之间的交叉流动是碳酸盐块形成的常见问题。补救井服务需要昂贵的有线,线圈管(CT)和刺激单元的多重动员。由于识别问题和实施动作之间的时间差异,结果可能不准确。新的光纤螺旋管(FOECT)系统支持许多井干预服务,例如具有单个CT串的生产测井,水关闭和/或酸刺激。将FOECT与实时多相生产测井工具(MPLT)相结合,可降低运行时间,提高补救措施质量控制。通过使用相同的FOET的表面设备来减少停机时间来执行多相测井和补救作品。只需要改变所需的底孔组件(BHA)。 Saudi Aramco的这份成功的记录作业允许在生产日志记录作业后立即进行评估纠正良好服务,以最大限度地控制质量控制。本文与实时MPLTS执行了FOECT系统的实施,并演示了Ghawar领域的以下改进:1。在沙特派粪便系统中首次用于注销湿润的油生产者,以便立即评估补救措施的评估需要。 2.通过消除电缆,CT和泵送单元的多次动员,大大减少了良好的停机时间。 3.使用FOECT和MULTIPHASE TOOL和单一采集系统设置建立了生产测井的最佳实践。 4.通过消除电线(E-LINE)测井单元优化所需的设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号