首页> 外文会议>International Conference on Mechatronics and Intelligent Materials >The management cost forecasted of retaking expired operating highway based on the grey model GM (1,1)
【24h】

The management cost forecasted of retaking expired operating highway based on the grey model GM (1,1)

机译:基于灰色模型GM(1,1)的重新定向运行高速公路的管理成本预测

获取原文

摘要

For retaking expired operating highway, in order to maintain and enhance the normal operation condition of the highway, we still need continue to operate on highway management and maintenance, relevant departments must also be accurately measure the highway management cost. The paper is on the basis of the analysis of the construction of expired operating highway cost, builds expired operating highway's management cost prediction model based on the grey model GM (1,1), and examples verify the effectiveness of the model.
机译:为了固定到期的运行高速公路,为了保持和提升高速公路的正常运行条件,我们仍然需要继续在公路管理和维护上运行,有关部门还必须准确衡量公路管理成本。本文是在分析到期运行公路成本的建设的基础上,基于灰色模型GM(1,1)构建过期的运行高速公路管理成本预测模型,并验证了模型的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号