首页> 外文会议>International Conference on Frontiers of Manufacturing and Design Science >Stability Analysis of Surrounding Rocks and Initial Support Structure in Phyllite Tunnel Construction Process
【24h】

Stability Analysis of Surrounding Rocks and Initial Support Structure in Phyllite Tunnel Construction Process

机译:围岩隧道隧道施工过程中周围岩石和初始支撑结构的稳定性分析

获取原文

摘要

Taking Liang Zhuang phyllite tunnel as the research object, the paper tries to analyze the variation rules of formation stress and initial support stress in the construction process based on numerical simulation of surrounding rocks grade III, IV and V, and also by using the measured data to have a better analysis of the stress state of surrounding rocks and support in the construction process, thus to grasp the rules for better construction. The result shows that the maximum compressive stress of initial support increases in the process of excavation, while the maximum formation stress is relatively stable in the process of excavation, with a slightly down trend, and whether there is a rock bolt or not, it doesn't have an obvious effect on the distribution and size of initial support stress.
机译:采用梁庄百岩隧道作为研究对象,基于周围岩石等级III,IV和V的数值模拟,分析了施工过程中的形成应力和初始支持应力的变化规则,以及使用测量数据为了更好地分析周围岩石的压力状态和在施工过程中的支持,从而掌握了更好的结构的规则。结果表明,初始支持的最大压缩应力在挖掘过程中增加,而最大的形成应力在挖掘过程中相对稳定,略微下降,以及是否有岩石螺栓,它没有'T对初始支持压力的分布和大小有明显影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号