首页> 外文会议>Workshop on sediment problems and sediment management in Asian river basins >Channel degradation in the Yangtze River after the impoundment of the Three Gorges Project
【24h】

Channel degradation in the Yangtze River after the impoundment of the Three Gorges Project

机译:三峡工程蓄水后长江渠道降解

获取原文

摘要

The impoundment of the Three Georges Project (TGP) caused a major decrease in the sediment load downstream from the dam, and this inevitably resulted in channel degradation, which has important implications for flood control, navigation conditions and aquatic ecology in the whole river basin. Based on analysis of field data and mathematical modelling, estimates of the reduction in sediment load and the resulting channel degradation in the Yangtze River downstream from the dam are reported in this contribution. Comparison of the results of the current study with those of previous studies and with field data demonstrates that the model prediction of channel degradation in the Yangtze River after the impoundment of the TGP obtained in the current study conform more closely with the field data than previous predictions.
机译:三个乔治项目(TGP)的​​蓄积导致大坝下游沉积物负荷的重大减少,这不可避免地导致渠道退化,这对整个河流流域的防洪,导航条件和水生生态产生了重要意义。基于对现场数据和数学建模的分析,在该贡献中报告了大坝下游沉积物负荷减小的估计和沉积物负荷的降低和所得信道降解。与先前研究的研究结果的比较和现场数据的研究表明,在当前研究中获得的TGP的蓄积之后,长江在长江横来的模型预测与现场数据相比比以前的预测更紧密地符合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号