The viscous oil resource of Kuwait poses special challenge since about 40-50% of the resource is distributed over a very large area with pay thickness in the range of only 20-30 ft. These low pay thickness areas are considered marginal for conventional thermal EOR and may need an innovative approach for economic exploitation. Horizontal wells, both for primary production as well as for thermal EOR, have been successfully used in such reservoirs (Araque-Martinez et.al. 1996, Malik, S. et.al, 2010). In this context, drilling of horizontal wells for this viscous oil reservoir is considered a key milestone for development of this vast resource. The challenges for the shallow viscous oil formation drilling, requires shallow horizontal medium-radius wells in extremely soft formation, with kick off from 150 ft MD. The initial plan was to drill six horizontal wells in the early phase, followed by a field study, before further expansion into horizontal drilling. Baker Hughes has successfully drilled three horizontal wells of the six wells, and has set the benchmark for shallow horizontal medium-radius wells in the extremely soft Shallow viscous oil formations formation. The horizontal wells require kick off from 150 ft MD in the loose sand formation of Shallow viscous oil formations, posing a strong directional drilling challenge. Maximum TVD for the wells are approximately 715 ft TVD RKB, which requires landing the wells in less than 5 ft TVD, with tolerance for navigation in the 6.125 in. lateral section within +/-1 ft (i.e., less than bit OD). The requirement is to geosteer along reservoir sand with the help of proactive geosteering services, maintaining optimum drilling parameters for good borehole quality. The solution included the geosteering services with rotary steerable systems, LWD density, porosity and distance-to-bed boundary tools. With average horizontal section lengths of 1,100 to 1,200 ft, drilled in reservoir sand of shallow viscous oil formations formation, Baker Hughes has drilled the longest horizontal section of 1,307ft in the soft formations. The synchronized team efforts from Kuwait Oil Company along with the Baker Hughes team resulted in consistent good execution of the three shallow horizontal medium-radius wells in Shallow viscous oil formations project, with optimal well placement, achieving 100-percent reservoir exposure.
机译:科威特的粘性石油资源造成特殊挑战,因为大约40-50%的资源分布在一个非常大的区域上,支付厚度在20-30英尺的范围内。这些低支付厚度区域被认为是常规热EOR的边缘并且可能需要一种创新的经济利用方法。用于初级生产以及热EOR的水平孔已成功地用于这种储层(Araque-Martinez et.al.1996,Malik,S. et.al,2010)。在这种情况下,对于这种粘性油藏的水平井的钻井被认为是这种庞大资源的关键里程碑。浅粘性油形成钻孔的挑战需要极其柔软的形成浅水平介质孔,从150英尺MD开始。初步计划是在早期阶段钻六个水平井,然后进行现场研究,进一步扩展到水平钻井之前。 Baker Hughes已经成功地钻了六个井的三个水平井,并在极其柔软的浅粘性油部形成中设定了浅水平中半径孔的基准。水平井在浅粘性油形成的松散砂形成中,液体井从150英尺MD开始,构成了强大的方向钻探挑战。井的最大TVD大约是715英尺的TVD RKB,它需要在不到5英尺的TVD中降落井,在6.125中具有公差。+/- 1 ft(即,小于位OD)内的横向部分。要求借助于主动地汇总服务,对水库沙子进行地升,维持最佳钻孔参数,以获得良好的钻孔质量。该解决方案包括具有旋转可转向系统,LWD密度,孔隙度和床距边界工具的地形猎线服务。平均水平截面长度为1,100至1,200英尺,在浅粘性油泥浆地层的储层砂中钻孔,贝克休斯在柔软的地层中钻了最长的水平部分1,307英尺。来自科威特石油公司与贝克休斯队团队的同步团队努力导致浅层粘性油层项目中三大浅水横向半径井的一致执行,具有最佳的井放置,实现100%的水库暴露。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号