首页> 外文会议>International Conference on Chemical Engineering and Advanced Materials >3D Modeling and Motion Simulation of Mine Skip Getting through Dump Rail Based on Pro/E
【24h】

3D Modeling and Motion Simulation of Mine Skip Getting through Dump Rail Based on Pro/E

机译:基于PRO / E的矿山跳过的3D建模与运动仿真

获取原文

摘要

3D modeling, virtual assembly and motion simulation of an up-open fan gate mine skip were completed with Pro/Engineer software. During virtual design, faults of a mine skip such as static and dynamic interference can be found out prior to be made, which is helpful to optimize it. Furthermore, it is effective to shorten design period of mine skip and save development cost and improve design quality.
机译:使用Pro / Engineer软件完成了Up-Open Fan Gate Mine Skip的3D建模,虚拟装配和运动仿真。在虚拟设计期间,可以在制作之前发现静态和动态干扰等矿山跳过的故障,这有助于优化它。此外,缩短矿山跳跃设计时期是有效的,节省开发成本,提高设计质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号