Analysis on Multi-factorial Risk Coupling Effect of Construction schedule of Large Construction Projects

机译:大型建筑项目施工时间表的多因素风险耦合效应分析

获取原文

摘要

This paper aims at researching on multi-factorial risk coupling effect on construction schedule of large construction projects. Combined with related data of construction industry in China and with the means of N - K model and Matlab simulation, the paper has got the effective value of multi-factorial risk coupling. The result shows that personnel is the key factor in multi-factorial risk coupling which leads to project accident and schedule delays. Therefore, paying attention to multi-factorial risk coupling, especially including personnel factor to make early measures can narrow risks down and reduce losses.
机译:本文旨在研究大型建筑项目施工时间表的多因素风险耦合效应。结合中国建筑业的相关数据以及N - K模型和MATLAB仿真的手段,本文已有有效的多因素风险耦合值。结果表明,人员是多因素风险耦合的关键因素,从而导致项目事故和计划延误。因此,关注多因素风险耦合,尤其是人事因素,使早期措施可以缩小风险并减少损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号