首页> 外文会议>International Conference on Structures and Building Materials >The study on the control of the early-stage crack of the concrete poured in winter in Shenyang subway
【24h】

The study on the control of the early-stage crack of the concrete poured in winter in Shenyang subway

机译:沉阳地铁冬季混凝土早期裂缝控制研究

获取原文

摘要

The control of concrete crack is a complicated and difficult problem for civil engineering. It is more difficult to control the crack of the concrete poured in winter. Thorough the analysis of the construction of Shenyang subway in winter, a combination of methods are applied. Frost proof and decreasing the temperature stress of concrete are considered together. The combination of antifreezing measures and decreasing the temperature stress of concrete make the construction quality arrive a satisfying level.
机译:对土木工程的一个复杂和难题的控制。更难以控制冬季浇注的混凝土的裂缝。彻底分析冬季沉阳地铁建设,采用了方法的组合。将混凝土的霜筒证明和降低混凝土的温度胁迫。防冻措施和减少混凝土温度应力的组合使施工质量达到满意的水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号