As part of ongoing gas exploration efforts, Petroleum Development Oman (PDO) is currently executing a fast-track four well drilling campaign targeting deep, high temperature and potentially high pressure prospects (CITHP>10,000 psi, BHST >170° C),using under-balanced drilling in the Fahud Salt Basin in the Sultanate of Oman. In early 2009, a co-located, ring-fenced multi-disciplinary team including two Well Engineers was set-up. The objective was to spud the first well before the end of 2009 and complete the four well campaign within two years. This paper describes the process followed to progress well designs, procure materials and get the rigs and people in place in only 8 months from project kick-off to spudding the first well. Recognized industry standards indicate that such projects typically take more than 18 months to deliver. Using PDO's experience in deep gas exploration it was possible to standardize well components and only introduce additional items where unavoidable. To further accelerate the project, the two campaign rigs were upgraded with Top Drive Systems and 7500 psi mud circulating capability. The paper goes on to present the drilling challenges and learnings gathered from the first two wells. , Both wells were a technical success and delivered within the planned time and cost. The deepest well at 7145 m AH set Sultanate of Oman records for total depth and bottom-hole temperature. The key challenges faced were downhole tool reliability, directional control in a long slim hole reservoir, drill string dynamics, short planning interval, just in time material delivery and bit and downhole drive optimization. Significant future time and cost reduction is expected to be possible by applying the key learning’s on future wells.
机译:作为持续的气体勘探工作的一部分,石油开发阿曼(PDO)目前正在使用下瞄准深度,高温和潜在的高压前景的快速轨道四个井钻探活动(Cithp> 10,000 psi,Bhst> 170°C),使用在阿曼苏丹酸盐的Fahud盐盆中进行了平衡的钻井。 2009年初,一个共同的戒指围栏的多学科团队,包括两个好的工程师。目标是在2009年底之前第一次努力,并在两年内完成四项井展活动。本文介绍了进展井设计,采购材料的过程,从项目启动时仅在8个月内完成钻机和人员,从项目启动到第一个井。公认的行业标准表明,此类项目通常需要超过18个月才能提供。使用PDO在深海勘探中的经验,可以标准化井部件,只会引入不可避免的额外物品。为了进一步加速该项目,两个竞选钻机用顶部驱动系统和7500 psi泥浆循环能力升级。本文继续展示钻井挑战和从前两个井收集的学习。 ,这两个井都是技术成功,并在计划的时间和成本内交付。最深的井7145米啊,苏丹国的苏丹酸盐,用于总深度和底部孔的温度。面临的关键挑战是井下工具可靠性,长长孔储层的定向控制,钻柱动态,短规划间隔,即时材料输送和钻头和井下驱动优化。通过应用关键学习的未来井来实现重要的未来时间和成本降低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号