首页> 外文会议>International Conference on Civil Engineering,Architecture and Building Materials >Research on the method of determining m value of the rock-socketed continuous wall
【24h】

Research on the method of determining m value of the rock-socketed continuous wall

机译:确定岩石插座连续墙体M值的方法研究

获取原文

摘要

In recent years the rock-socketed continuous concrete walls have been applied in supporting structure of foundation excavation, and the main problem of which is how to simulate m value of wall bottom bedrock. In this paper, the m value of rock-socketed underground continuous concrcte wall bedrock is monitored by a structural test about a typical engineering. The monitored data of foundation excavation supporting deformation are fitted by least-square method, and the bedrock m value of which are researched and analyzed based on an optimization method and fitting deformation curves. The test shows the monitored m value meets the corresponding engineering regulations and is related with the broken degree of rock on the monitored position, and the variability of which is lesser in the construction process.
机译:近年来,岩石插座的连续混凝土墙已应用于基础挖掘的支撑结构,以及如何模拟壁底基岩的M值。本文通过关于典型工程的结构试验监测了岩石插座地下连续混凝土墙岩基岩的M值。基础挖掘支撑变形的受监测数据被最小二乘法配合,基于优化方法和装配变形曲线研究和分析了基岩M值。该测试显示受监测的M值符合相应的工程法规,与监测位置上的岩石变坏程度有关,并且在施工过程中的可变性较小。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号