首页> 外文会议>International Conference on Civil Engineering,Architecture and Building Materials >Study on Settlement of Railway Embankment on Deep Completely Decomposed Granite Ground by Centrifugal Model Tests
【24h】

Study on Settlement of Railway Embankment on Deep Completely Decomposed Granite Ground by Centrifugal Model Tests

机译:离心模型试验沉降铁路堤防铁路堤坝的研究

获取原文

摘要

The settlement cntrol of high-speed railway is a key technology in embankment engineering. In order to reveal the engineering characteristics of the deep completely decomposed granite soil in Hainan east loop line, a passenger dedicated line, four groups of centrifuge model tests were conducted to study the settlement properties of the subsoils untreated, treated by dynamic compaction, and reinforced with cement-mixed piles, under the action of the embankment, especially the relationship between settlement and time, including the settlement during and post-construction. The results show that the Weibull model can describe the relationship between embankment settlement and time well, and that the post-construction settlements of the subsoil meet the requirements of the relevant code. Among the two foundation treatment measures, dynamic compaction is more effective than reinforcement with cement-mixed piles, and the pressure on the contact surface between embankment and subsoil was obviously different from the commonly used calculated values.
机译:高速铁路的结算CNTROL是堤防工程的关键技术。为了揭示海南东循环线的深度腐烂的花岗岩土的工程特性,进行了四组离心模型试验,研究了通过动态压实治疗的未处理的底层的沉降性能,加强在水泥混合桩,在堤防的作用下,特别是解决和时间之间的关系,包括在建设期间和建设后的结算。结果表明,威布尔模型可以描述堤防结算与时间之间的关系,以及底层的后施工结算符合相关代码的要求。在两个基础处理措施中,动态压实比水泥混合桩的加固更有效,并且路堤和底层之间的接触表面的压力明显不同于常用的计算值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号