首页> 外文会议>International Conference on Civil Engineering,Architecture and Building Materials >Earthquake Responses for Non-proportion Damping System Based on Clough-Penzien Three-step Non-stationary Seismic Random Model
【24h】

Earthquake Responses for Non-proportion Damping System Based on Clough-Penzien Three-step Non-stationary Seismic Random Model

机译:基于Clough-Penzien三步非平稳地震随机模型的非比例阻尼系统的地震反应

获取原文

摘要

The solution method for earthquake responses of non-proportion damping system based on Ciough-Penzien three-step non-stationary seismic random model is investigated in this paper. Firstly, the unified motion equation of non-proportion damping system is set up and then decoupled by complex mode method. Secondly, the earthquake responses in time-frequency domain are calculated by taking Ciough-Penzien three-step non-stationary seismic random model as excitation, which ground motion parameters consistent with that of design response spectrum in china seismic code, and then the non-stationary time-varying variance of earthquake responses can be obtained, subsequently, the variances of equivalent stationary responses are integraled in ground motion duration. At last, an example of base seismic-isolation system is given to show the application of the proposed method.
机译:本文研究了基于CIUGH-PENZIEN三步非平稳地震随机模型的非比例阻尼系统的地震反应的解决方法。首先,建立非比例阻尼系统的统一运动方程,然后通过复杂模式方法解耦。其次,通过将Ciouge-Penzien三步非平稳地震随机模型作为激励来计算时频域中的地震反应,该运动参数与中国地震规范的设计响应谱一致的地面运动参数,然后是非随后,可以获得地震反应的静止时变差,随后,等效静止响应的差异在地面运动持续时间内被整合。最后,给出了基础地震隔离系统的一个例子来展示所提出的方法的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号