Indonesia ‘’Tunu 18 days’’ Project Case History: Innovations and New Technologies Bringing the Well Construction Performance to Unthinkable Levels

机译:印度尼西亚的'TUNU 18天'项目案例历史:创新和新技术为不可想象的水平带来了良好的施工表现

获取原文

摘要

Tunu is a giant gas field discovered in 1977 and located in the Indonesian Mahakam delta, East Kalimantan. To support the field development maintaining a high gas production level, more than 750 wells have been drilled and completed. Late 2010, Tunu field cumulative production was over 7.5 Tcf gas. Five rigs are continuously drilling in the swamp area to deliver around 100 wells per year highlighting the stakes associated to the well construction optimization. Since the 80’s and the early beginning of the drilling operations on Tunu, a tremendous work has been done to 1) reduce the overall well construction duration, 2) reduce the well equipment costs without jeopardizing the operations safety and the wells productivity. The first important leverage was the implementation of innovative well architectures in order to construct ‘’fit for purpose’’ wells strictly answering to the subsurface formation characteristics avoiding any over design. The evolution of the technology has been fully utilized and wisely implemented in order to improve the performance of our drilling and completion operations. A huge effort has been delivered to minimize the costs associated to the equipment design and material selection. Finally, a shared performance culture has been successfully implemented on our operations to systematically challenge ourselves outside of our comfort zone: the ‘’Industrialization’’ of the well construction process is now developed. The Tunu wells targeting the ‘’main zone’’ reservoirs have seen their average duration reduced by 70%!!! From a well duration of 55 days in the early 80’s, the drilling and completion teams managed to reduce it down to 17 days in 2011. This performance level has been reached over 30 years of thorough improvement process follow-up. A joint effort of all involved entities as geosciences, marine, logistics, planning, service companies and well teams made this achievement possible. In 2011, two innovative well architectures have been implemented on Tunu and field trials are planned for two new technologies. The continuous improvement process is not closed yet: ‘’Tunu 15 days’’ on its way to become a reality?
机译:Tunu是1977年发现的巨型天然气场,位于印度尼西亚Mahakam Delta,东加里曼丹。为了支持该领域的发展保持了产气量高的水平,超过750口井已完钻了。 2010年末,Tunu场累计产量超过7.5万亿立方英尺天然气。五台钻机在沼泽地区,提供每年约100口井突出相关联建井优化的利害关系不断钻探。自上世纪80年代和Tunu钻井作业的早期开始,一个巨大的工作已经完成,1)减少总的精心施工时间,2)降低以及设备成本,而不危及运行安全和井生产率。第一个重要的杠杆作用究竟是创新的良好架构,以构建'适合目的”井严格回答了地下地层的特性,避免任何在设计实施。该技术的演进已经充分利用,以提高我们的钻井和完井操作的性能明智地实施。巨大的努力已交付,以尽量减少对相关设备的设计和材料选择的成本。最后,共享绩效文化已经成功地在我们的操作来实施外,系统地挑战自我,我们的舒适区:井施工过程中的'产业化”,现在开发的。该Tunu井瞄准'主区”水库已经看到他们的平均持续时间减少了70%!从55天在80年代初期良好的持续时间,管理的钻井和完井的团队,以减少下来17天在2011年这种性能水平已超过30年彻底改进过程后续到达。所有参与实体地质,海洋,物流,策划,服务公司和良好的团队的共同努力下取得这样的成就成为可能。在2011年,两项创新以及架构已经实施了Tunu和现场试验计划的两项新技术。在不断完善的过程还没有结束:“” Tunu 15天”的道路上成为现实?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号