首页> 外文会议>AWEA offshore windpower conference exhibition >Operational challenges in manufacturing a 6MW Direct Drive wind turbine offshore prototype
【24h】

Operational challenges in manufacturing a 6MW Direct Drive wind turbine offshore prototype

机译:制造6MW直接驱动风力涡轮机近海原型的运营挑战

获取原文
获取外文期刊封面目录资料

摘要

Reducing the cost of offshore wind power requires the development of a new generation of direct drive offshore wind turbines that reach new extremes in component dimensions. These create a whole set of new logistic and manufacturing challenges that the industry needs to address. The operational experience in manufacturing a 6MW prototype incorporating these large components will be discussed. A temporary assembly process used for the demonstration phase is presented. Based on the above, the paper concludes on the optimal serial manufacturing process and provides a selection of conditions for an industrial site.
机译:降低海上风电的成本需要开发新一代直接驱动的近海风力涡轮机,可以在元件尺寸中达到新极端。这些创造了一整套新的物流和制造挑战,即行业需要解决。将讨论制造包含这些大型组件的6MW原型的操作经验。提出了用于演示阶段的临时装配过程。基于以上,本文得出最佳的连续制造过程,为工业部位提供了各种条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号