Transition: from EP to CCS, how to deal with existing mining licences and infrastructure

机译:过渡:从E&P到CCS,如何处理现有采矿许可证和基础设施

获取原文

摘要

In the beginning of 2009 the Dutch government planned to adopt a long term strategy for CO2 transport and storage in the Netherlands. This strategy should be adopted in 2010. The Minister of Economic Affairs asked Gasunie B.V. (Gasunie) and Energie Beheer Nederland B.V. (EBN) to advise the Minister with respect to this strategy. One of the questions referred to the so-called transition period: from mining activities to carbon storage. What measures are necessary to accommodate this transition period? Depending on the long term strategy several changes in legislation could be necessary. These changes should allow the Minister of Economic Affairs to promote or -if desirable- enforce carbon storages. This article describes two main legal aspects of this transition period: the availability of CO_2 storage licences and the possibilities for re-use of existing infrastructure. Currently no depleted reservoirs are available for CCS. For most areas a mining licence has been granted. From the EBN/Gasunie study it follows that a smooth and cost effective transition from production to storage will be enhanced, if the existing mining licence holder can be the future CO_2 storage licence holder. In this article it is set out how the existing mining licence holder can be enabled to acquire the CO_2 storage licence. Further, it is set out how the government can create free areas in order to facilitate storage by third parties, in case E&P operators are not interested in CO_2 storage. Further re-use of infrastructure seems, from a cost perspective, advisable and should be facilitated by the Government. One of the findings of the EBN/Gasunie advice is that in general the preservation of infrastructure is cost efficient if the preservation period is maximized to ten years. At the end of this article it is examined for each sort of infrastructure how preservation is best secured.
机译:2009年初,荷兰政府计划在荷兰的二氧化碳运输和储存中采取长期战略。该策略应在2010年通过。经济事务部长辞索Birunie B.V.(Gasunie)和Energie Beheer Nederland B.v.(Ebn)向部长提供咨询这一战略。提到所谓的过渡期的问题之一:从采矿活动到碳储存。适应这种过渡期需要有什么措施?根据长期策略,可能需要几次立法变动。这些变更应允许经济部长促进或促进碳储存。本文介绍了该转换期的两个主要法律方面:CO_2存储许可证的可用性以及重复使用现有基础架构的可能性。目前没有耗尽的水库可用于CCS。对于大多数领域,已授予采矿许可证。从EBN / Gasunie学习中,如果现有的采矿许可证持有人可以是未来的CO_2存储许可证持有者,将提高从生产到储存的平稳和经济高效的转换。在本文中,它旨在启用现有的挖掘许可证持有者如何能够获取CO_2存储许可证。此外,阐述了政府如何创造自由地区,以便于第三方储存,以防E&P运营商对CO_2存储不感兴趣。从成本透视,可被政府促进,进一步重复使用基础设施似乎。 EBN / GASUNIE建议的一个调查结果是,如果保存期最大化到十年,则一般来说,基础设施的保存是成本效益。在本文结束时,将检查每种基础设施,保存最佳安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号