首页> 外文会议>Asia-Pacific drying conference >APPLICATION AND COST ANALYSIS OF SLUDGE DRYING TECHNOLOGY: CASE STUDY IN A MUNICIPAL WASTEWATER TREATMENT PLANT
【24h】

APPLICATION AND COST ANALYSIS OF SLUDGE DRYING TECHNOLOGY: CASE STUDY IN A MUNICIPAL WASTEWATER TREATMENT PLANT

机译:污泥干燥技术的应用与成本分析:市政废水处理厂案例研究

获取原文

摘要

This paper evaluated the operation statue of two-phases sludge drying technology (Innoplana dry 2E) from both the technical and economic aspect. The tested equipment was one part of sludge treatment process in La Test du Buch wastewater treatment plant (WWTP), located at the south west of France and adjacent to the Atlantic. This WWTP produced 5.5.7.5 tons of sludge (dry basis, t-ds) per day which were supposed to be treated by the drying technology. The results showed that the drying technology had a significant economic advantage. The treatment costs by sludge drying in winter and summer were 217?/t-ds and 155?/t-ds, respectively, accounting for 53% and 38% of the cost that the dewatered sludge was transported out for the further treatment.During the tourist season (i.e.Jul.and Aug.), the sludge amount exceed the treatment capacity of the drying equipement, while at the off season, the uptime for the equipement was insufficient mainly due to the clogging of screens. The solution for this problem may be controlling the drying temperature, adjusting the replacement frenquency of screens and assuring the normal operation of sewage treatment facilities.
机译:本文评估了两阶段污泥干燥技术(Innoplana Dist 2E)的操作雕像,从技术和经济方面进行了评价。测试设备是La Test du Buch废水处理厂(WWTP)的污泥处理过程的一部分,位于法国西南部,毗邻大西洋。该WWTP每天生产5.5.7.5吨污泥(干基,T-DS),该污泥应由干燥技术治疗。结果表明,干燥技术具有显着的经济优势。冬季和夏季污泥干燥的治疗成本分别为217?/ T-DS和155℃,占脱水污泥的成本的53%和38%,以便进一步处理。发布旅游季节(IEJUL.AND 8月),污泥量超过了干燥设备的处理能力,而在淡季的同时,设备的正常运行时间是不足的,主要是由于屏幕堵塞。该问题的解决方案可能是控制干燥温度,调整屏幕的替代息点并确保污水处理设施的正常运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号