首页> 外文会议>International Renewable Energy Storage Conference and Exhibition >Planning and permitting process to build pumped storage facilities - (PPT)
【24h】

Planning and permitting process to build pumped storage facilities - (PPT)

机译:规划和允许进程建立泵送存储设施 - (PPT)

获取原文

摘要

Project development needs strong political and communal support. With careful planning, technical and legal preparation and negotiation of all formal and informal hearings with authorities and public risks for pumped storage facility projects can be significantly reduced.
机译:项目发展需要强大的政治和公共支持。通过仔细的规划,与当局的所有正式和非正式听证会和泵送存储设施项目的公共风险的技术和法律准备和谈判可以大大减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号