首页> 外文会议>International Conference on Advanced Engineering Materials and Technology >The Application and Construction of Light Steel Roof Truss in the Hydropower Station Tunnel
【24h】

The Application and Construction of Light Steel Roof Truss in the Hydropower Station Tunnel

机译:水电站隧道轻钢屋顶桁架的应用与构造

获取原文

摘要

The hydropower station tunnel construction is crossover operation and environment is poor. Installation space and time are limited. The paper introduces corresponding measures and installation method. Through field investigation and vast demonstration, using electric hoist and little bridge machine in equipment assembly area can avoid the effect to power house equipment installation and reduce crossover operation time. Using installation platform on the little bridge in hydro-generator area can reduce the use of the little bridge machine and improve the installation efficiency.
机译:水电站隧道施工是交叉操作和环境差。安装空间和时间有限。本文介绍了相应的措施和安装方法。通过现场调查和广泛的示范,使用设备组装区域的电动葫芦和小桥机可以避免电源屋设备安装效果,减少交叉操作时间。在水力发生器区域的小桥上使用安装平台可以减少小桥机的使用,提高安装效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号