首页> 外文会议>IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies >Current and imminent challenges for the transmission system operator in Germany
【24h】

Current and imminent challenges for the transmission system operator in Germany

机译:德国传输系统运营商的当前和迫在眉睫的挑战

获取原文

摘要

During the past couple of years, the complexity of transmission system operation has increased significantly. Along with the liberalization of the electricity markets a broad range of new, varying tasks have arisen and with this a significant increase of interfaces which the operators in control centres have to cope with. Furthermore the substantial growth of volatile wind and PV energy sources and large-scale energy trades across wide-areas lead to frequently changing load flow situations. As a consequence of these huge load flows, the power system is more frequently operated ever closer to its security limits. This situation is further aggravated by recent developments as the so called Nuclear Power Plant (NPP) Moratorium in Germany came in effect as a reaction to the Japanese disaster in Fukushima. The following paper will provide an overview of the current challenges facing Amprion, one of the four Transmission System Operator (TSO) in Germany, and will present examples of solution approaches.
机译:在过去几年中,传输系统操作的复杂性显着增加。随着电力市场的自由化,出现了广泛的新的,不同的任务,并且随着控制中心的运营商必须应对的界面的显着增加。此外,挥发性风和光伏能源的大幅增长和跨越广域的大规模能源交易导致频繁地改变负载流动情况。由于这些巨大的负载流量,电力系统更频繁地恢复其安全限制。由于最近的发展进一步加剧了这种情况,因为所谓的核电厂(NPP)暂停在德国的暂停成为对日本灾难的反应。以下论文将概述德国四个传输系统运营商(TSO)之一的Amprious面临的当前挑战,并将提出解决方案方法的示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号