首页> 外文会议>International Conference on Computer Design and Applications >Estimating Job Execution time and Handling Missing Job Requirements Using Rough Set in Grid Scheduling
【24h】

Estimating Job Execution time and Handling Missing Job Requirements Using Rough Set in Grid Scheduling

机译:使用粗略集合在网格调度中估算作业执行时间和处理缺失的作业要求

获取原文

摘要

Efficient scheduling of jobs in grid environment is a challenging task. To perform better resource utilization and proper resource allocation, the factor job runtime is essential. Accurate estimation of runtime helps to reserve resources in advance, provide user level QoS. But it is difficult to estimate the runtime of data intensive applications. Users are required to provide the runtime estimate of the job, but the user given estimates are inaccurate leading to poor scheduling. In this paper, we have used rough set techniques to analyse the history of jobs and estimate the runtime of the job. This requires maintaining a history of jobs that have executed along with their respective runtime. Our proposed rough set engine groups similar jobs and identifies the group to which the newly submitted job belongs. Based on this similar group identified, the runtime is estimated. Mostly users are not aware of resources, submitting incomplete job requirements. These missing job requirements affect data analysis. Those missing values should be accurately predicted. Missing value handler designed using rough sets fills the most probable value for missing attributes and then the runtime is estimated.
机译:高效调度网格环境中的作业是一个具有挑战性的任务。为了执行更好的资源利用率和适当的资源分配,因子作业运行时间至关重要。准确估计运行时有助于预先保留资源,提供用户级QoS。但难以估计数据密集型应用程序的运行时间。用户需要提供工作的运行时估计,但用户给出的估计值不准确,导致调度差。在本文中,我们使用了粗糙的集合技术来分析工作历史并估计作业的运行时间。这需要维护与其各自的运行时执行的作业的历史。我们所提出的粗糙集发动机组类似的作业,并识别新提交的工作所属的小组。基于识别的类似组,估计运行时。主要用户不了解资源,提交不完整的工作要求。这些缺失的工作要求会影响数据分析。应该准确预测那些缺失的值。使用粗糙集设计的缺失值处理程序填充缺少属性的最可能值,然后估计运行时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号