首页> 外文会议>Applied Technology Council Structural Engineering Institute conference on improving the seismic performance of buildings and other structures >Seismic Evaluation and Rehabilitation of a Three Story Pre-Northridge Steel Frame Essential Service Facility
【24h】

Seismic Evaluation and Rehabilitation of a Three Story Pre-Northridge Steel Frame Essential Service Facility

机译:地震评价与康复三层楼钢框架基本服务设施

获取原文

摘要

The 1994 Northridge earthquake exposed the vulnerability of steel moment frame structures to seismic damage. This paper summarizes the performance-based seismic retrofit of a three-story steel moment frame building in the San Francisco Bay Area of California. The building is located within a few hundred feet of the Hayward fault and serves as an essential service facility. ASCE 41 was used in conjunction with FEMA 351 to assess the anticipated performance of the existing building and to evaluate several retrofit options. Retrofit options included: connection upgrades, the addition of either energy dissipation or buckling restrained braces, and combinations of these approaches. Various performance objectives were studied and varied from Life-Safety to Immediate Occupancy and included the evaluation of both structural and non-structural systems. Schematic level plans and associated estimate of probable cost were developed for each of the six schemes. After extensive discussions with the owner, an Immediate Occupancy level of performance at the DBE emerged as the desired objective for the retrofit. The strengthening scheme is currently in design development and will include the combination of connection upgrades and new buckling restrained braces. The design phase will employ non-linear static and dynamic analyses to evaluate the efficiency of the retrofit.
机译:1994年的北极地震暴露了钢力矩框架结构的脆弱性,以抗震损伤。本文总结了加利福尼亚州旧金山湾地区的三层钢矩框架建筑的基于性能的地震改造。该建筑位于海沃德故障的几百英尺之内,并作为必不可少的服务设施。 ASCE 41与FEMA 351一起使用,以评估现有建筑物的预期性能并评估几种改造方案。包括改造选项包括:连接升级,添加能量耗散或屈曲受限制的括号,以及这些方法的组合。研究了各种性能目标,从生命安全到立即占用,并包括对结构和非结构系统的评估。为六种方案中的每一个开发了对可能成本的原理图水平计划和相关估计。在与所有者进行广泛讨论之后,DBE的直接占用水平是由于改造的所需目标。加强计划目前在设计开发中,并将包括连接升级和新屈曲受限制牙套的结合。设计阶段将采用非线性静态和动态分析来评估改造的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号